Duration
Project
Location
Client
June 2020 – January 2021
Engineering, Procurement, Construction, and Commissioning for Electrical System (including 20 kV System)
Waykanan, Lampung
PT. Mahameru Aksara Agri
February – April 2019
Electrical System Assesment and Engineering Drawing
All Plant
PT. DNX Indonesia
December 2020 – now
Remote Input – Output System for PLTMG Luwuk
Luwuk, Central Sulawesi
PT. Barata Indoneia – PT. PLN (Persero)
May 2021
Maintenance PLC in the WTIP System
Aceh
PT. Pertamina EP
Maintenance and commissioning MV Switchgear
Lahendong
PT. Pertamina Gheothermal Energy
November 2021
Troubleshooting MV Switchgear
April 2020
Electrical Remote Monitoring System for Electrical System
Lombok, NTB
PT. PLN (Persero)
July 2020 – now
Variable, Frequency Drive Panel for Water Treatment Plant Supply, including testing
October 2021
Busduct Repair – Water Leakage Issue
South Sumatera
PT. Suprame Energy
Busduct to Switchgear Connection Modification
Power Distribution Board
North Sumatera
PT. Sorik Merapi Gheotermal Power
December 2020 – August 2021
Sukabumi, West Java
PT. Tutu Kekal
Electrical, Procurement and Constuction
Nort Sulawesi
UPS Power System
Cepu
PT. Rekayasa Industri – PT Pertamina Project Cepu
August – September 2019
Testing Equipment Supply
DKI, Jakarta
PT Rekayasa Industri
August 2019
Electrical Hazard Assessment
Cikarang, West Java
PT Mondelez Indonesia
September 2019
Padalarang, West Java
PT Kraft Ultrajaya Indonesia
January 2020
Electrical Hazard and Thermography Assessment
SMPN 89 Jakarta
Electrical System Assessment
Way Kanan, Lampung
PT Mahameru
Aksara Agri
For further information and consulting, please click the information bottom